Photos

Keyword: Category: Tag: Sort By:
A box containing maintenance support equipment is hoisted onto a 25K Loader prior to entering the cargo hold of a C-17 Globemaster aircraft Dec. 30, 2013. The loading of 128,000 pounds of equipment was a collaborative effort by the 432nd Maintenance Group, 432nd Aircraft Maintenance Squadron, 432nd Operations Support Squadron, 99th Logistics Readiness Squadron, and the Installation Deployment Officer. (U.S. Air Force photo/Staff Sgt. A.D.)


Making the final flight

A box containing maintenance support equipment is hoisted onto a 25K Loader prior to entering the cargo hold of a C-17 Globemaster aircraft Dec. 30, 2013. The loading of 128,000 pounds of equipment was a collaborative effort by the 432nd Maintenance Group, 432nd Aircraft Maintenance Squadron, 432nd Operations Support Squadron, 99th Logistics Readiness Squadron, and the Installation Deployment Officer. (U.S. Air Force photo/Staff Sgt. A.D.)

Related Imagery